|
|
|
|
- Positioning in the Scheduler control
SchedulerPositionDateTime In french: PlanningPositionDateHeure Displays a Scheduler control from a specified date or returns the date of the first day (or last day) displayed in a Scheduler control.
// Positionne le champ Planning sur la date du jour SchedulerPositionDateTime(PLN_Planning, Today()) // Positionne le champ Planning au 20 décembre 2018 SchedulerPositionDateTime(PLN_Planning, "20181220")
New in version 28
// Renvoie la première date et heure affichée dans le champ Planning Trace(SchedulerPositionDateTime(PLN_Planning, orgDateTimeFirstVisible)) // Renvoie par exemple: 20220309175800000
Syntax
Positioning the schedule on a specified date Hide the details
SchedulerPositionDateTime(<Scheduler control> , <Start date>)
<Scheduler control>: Control name Name of Scheduler control to use. This control can correspond to: - the Scheduler control of a window,
- the Scheduler control of a report.
<Start date>: Character string or Date variable Start date for the display.
Finding out the first date or the last date displayed by the Scheduler control Hide the details
<Result> = SchedulerPositionDateTime(<Scheduler control> [, <Sought date>])
<Result>: Character string, Variable of type Date or DateTime Date (or Date and Time) displayed by the Scheduler control. <Scheduler control>: Control name Name of Scheduler control to use. This control can correspond to: - the Scheduler control of a window,
- the Scheduler control of a report.
<Sought date>: Optional Integer constant Type of sought date: | | New in version 28orgDateTimeFirstVisible | First date and time displayed in the Scheduler control (depending on the position of the elevator). | schCurrentMonth | First day of the month displayed in the Scheduler control. | schEndDate | Last date displayed in the Scheduler control. | schStartDate (Default value) | First date displayed in the Scheduler control. |
Remarks Positioning in the Scheduler control When SchedulerPositionDateTime is used to display a date, the Scheduler control keeps your display preferences. For example, if the Scheduler control displayed is a weekly schedule starting from Monday, SchedulerPositionDateTime used on a Friday displays the schedule from Monday to Sunday for the week that includes the specified Friday.
This page is also available for…
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|