|
|
|
|
|
SchedulerDisplayNextPeriod (Function) In french: PlanningAffichePeriodeSuivante Moves the time area displayed on the next area (next weeks for example) in a Scheduler control. The Scheduler control is displayed from the day corresponding to the next time area. Note: The SchedulerDisplayPreviousPeriod and SchedulerDisplayNextPeriod functions can be used to easily set up fields "Next / Previous" button. These controls allow you to scroll through the time areas displayed by the Scheduler control.
SchedulerDisplayNextPeriod(PLN_PlanningSalles)
Syntax
SchedulerDisplayNextPeriod(<Scheduler control>)
<Scheduler control>: Control name Name of the Scheduler control to be used.
This page is also available for…
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|