ONLINE HELP WINDEV, WEBDEV AND WINDEV MOBILE
Version: 2425262728
Positioning the schedule on a specified date Hide the details
Name of Scheduler control to use. This control can correspond to: the Scheduler control of a window, the Scheduler control of a report.
Start date for the display.
Finding out the first date or the last date displayed by the Scheduler control Hide the details
Date (or Date and Time) displayed by the Scheduler control.
Type of sought date: New in version 28orgDateTimeFirstVisibleFirst date and time displayed in the Scheduler control (depending on the position of the elevator).schCurrentMonthFirst day of the month displayed in the Scheduler control.schEndDateLast date displayed in the Scheduler control.schStartDate (Default value)First date displayed in the Scheduler control.
Positioning in the Scheduler control
Last update: 02/23/2023
Send a report | Local help
Searching...
I accept the terms of the license agreement
All you have to do is configure your product as follows: