ONLINE HELP
 WINDEVWEBDEV AND WINDEV MOBILE

Help / Control Centers / Project Management Hub
  • Overview
  • How to?
WINDEV
WindowsLinuxUniversal Windows 10 AppJavaReports and QueriesUser code (UMC)
WEBDEV
WindowsLinuxPHPWEBDEV - Browser code
WINDEV Mobile
AndroidAndroid Widget iPhone/iPadIOS WidgetApple WatchMac CatalystUniversal Windows 10 App
Others
Stored procedures
Overview
The time spent can be listed on:
  • the tasks of a requirement,
  • multiple requirements, etc.
How to?
To monitor the time spent on a task:
  1. Open or create a "Tasks" tab.
  2. In the ribbon, in the "Management" group, click "Time tracking".
  3. In the window that appears, click "Add tasks". Then, choose the tasks to be taken into account:
    Available options
    • Tasks from a list of requirements: in this case, select the list of requirements via the "..." button.
    • Tasks from a project: in this case, select a project via the "..." button.
    • Tasks from a requirement: in this case, select the list of requirements, then the desired requirement via the "..." button.
    • A selection of tasks: in this case, select the desired tasks via the "..." button.
    • Tasks of one or more contributors: in this case, select the contributors via the "..." button.
    • The type of tasks to be taken into account.
  4. The list of selected requirements and tasks is displayed in the window, with a calculation of the time spent on each task.
    Time tracking
The Time tracking window allows you to:
  • display the result by proposing to do the calculation over a given period ("Calculate the time spent over a given period").
  • view the details of the time spent on the tasks of a requirement ("Expand / collapse all").
  • print or export the task list.
Remark: No data is stored. The data is deleted each time the Time Tracking window is opened/closed.
Minimum version required
  • Version 24
This page is also available for…
Comments
Click [Add] to post a comment

Last update: 08/31/2023

Send a report | Local help